Mumbai–Pune Expressway: distance, route, exits, speed limits and food malls

Quick answer

The Mumbai–Pune Expressway, officially the Yashwantrao Chavan Expressway, is a 94.5 km, six-lane tolled road from Kalamboli near Panvel to Kiwale near Dehu Road, run by MSRDC and fully open since April 2002. Cars may drive at 100 km/h, and 60 km/h in the ghat. The Missing Link, opened on 1 May 2026, bypasses the Khandala ghat.

Mumbai–Pune Expressway distance, start and end points

The Mumbai–Pune Expressway, officially the Yashwantrao Chavan Expressway, is a 94.5 km access-controlled concrete road. It runs from Kalamboli, near Panvel in Navi Mumbai, to Kiwale, next to Dehu Road on the Pune side. The first sections opened in 2000 and the full length has been in use since April 2002. It has three lanes in each direction, with a shoulder on either side.

The road belongs to the Maharashtra State Road Development Corporation (MSRDC), a state government body, and is not a national highway. The old Mumbai–Pune highway, NH48, is a separate road that shares the Expressway’s alignment for a short stretch in the Khandala ghat. That shared climb was the usual bottleneck until the Missing Link opened in May 2026.

Two rules catch first-time users. Two-wheelers, three-wheelers, tractors, bullock carts, cyclists and pedestrians are not allowed on the Expressway, and halting on it is prohibited except in an emergency. It is also a toll road: a car pays ₹320 one way by FASTag. Our separate guide to Mumbai–Pune Expressway toll charges has the plaza-wise details.

Entry and exit points from the Pune side

From Pune, the Expressway begins at Kiwale, where it meets NH48. Traffic from Wakad, Hinjawadi, Baner and Katraj reaches it by the Katraj–Dehu Road bypass, and traffic from Nigdi and Dehu Road by the old highway. Kilometre stones are counted from Kalamboli, so the Pune end is near km 94 and the numbers fall as you drive towards Mumbai.

Published descriptions of the road name interchanges at Talegaon, Kusgaon, Khalapur and Kon (Shedung). Drivers also use the Somatane ramps and the Khandala and Khopoli exits in the ghat. Exits are far apart, and a missed one can mean a long detour, so know yours before you start. The table lists them in the order you meet them from Pune.

One point is new in 2026. The Missing Link leaves the old alignment near Kusgaon and rejoins it at the Khopoli exit. Autocar India reported at the opening that travellers for Lonavala still use the older ghat section, which is also where the Khandala exit is. If you are going to either town, follow the boards for the existing ghat route; our Missing Link guide has the detail.

Mumbai–Pune Expressway entry and exit points, in order from the Pune end
PointApprox. distance from KiwaleWhat it is used for
Kiwale (Pune end)0 kmStart of the Expressway. Meets NH48 for Pune city, Pimpri-Chinchwad, Hinjawadi and Dehu Road.
Somatane8 kmTalegaon Dabhade and the old highway at Somatane Phata.
Talegaon (Urse)11 kmMain toll plaza on the Pune side, with the Talegaon interchange. Food mall and fuel in both directions.
Kusgaon (Lonavala)40 kmLonavala town and the old highway. It is on the old alignment, so do not take the Missing Link if you want this exit.
KhandalaIn the ghatKhandala and the old highway. Not reachable from the Missing Link.
Khopoli exitFoot of the ghatKhopoli town. The Missing Link rejoins the old alignment here.
Khalapur61 kmMain toll plaza on the Mumbai side, with a ramp for Khalapur, Khopoli and the Pali road. Food mall and fuel in both directions.
Kon (Shedung)86 kmOld highway NH48 and the Panvel bypass.
Kalamboli (Mumbai end)94.5 kmEnd of the Expressway. Joins the Sion–Panvel Highway for Navi Mumbai and Mumbai.

Distances are rounded from published chainages, which are measured from Kalamboli. Follow the overhead boards, which name each exit well in advance.

Speed limits and how they are enforced

The limits in force come from a notice of Maharashtra’s Additional Director General of Police (Traffic) dated 19 April 2024. Cars and other passenger vehicles with up to eight seats, counting the driver’s, may do 100 km/h on the plain sections and 60 km/h in the ghat, where the car limit was 50 km/h before. Buses and goods vehicles are held to 80 km/h, and 40 km/h in the ghat. The notice treats km 35.5 to km 52 as the ghat section.

The Missing Link has its own rule. A notification dated 26 October 2026, in force from 1 November, fixes 100 km/h for cars and other light motor vehicles and 80 km/h for passenger buses. It adds that a speed within 5% of the limit will not be booked there. A 2025 proposal to raise the heavy-vehicle limit in the old ghat was reported, but we could not confirm that it was notified.

Enforcement is mostly by camera. The Intelligent Traffic Management System (ITMS) has been in place since July 2024 and monitors 17 kinds of violation, including overspeeding, lane cutting, driving without a seat belt, using a mobile phone, wrong entry and illegal parking. E-challans are raised against the number plate. Reports counted 27.76 lakh challans worth about ₹470 crore in the system’s first year.

Speed limits on the Mumbai–Pune Expressway by vehicle class
Vehicle classPlain sectionsOld ghat sectionMissing Link
Car, jeep or other vehicle with up to 8 seats100 km/h60 km/h100 km/h
Bus or passenger vehicle with 9 or more seats80 km/h40 km/h80 km/h
Goods vehicle80 km/h40 km/hNot allowed

As reported from the Additional DGP (Traffic) notice for the Expressway and the 26 October 2026 notification for the Missing Link. Where a board shows a lower limit, the board applies.

The Khandala ghat and the Missing Link

Between Khopoli and Lonavala the Expressway climbs the Bhor Ghat, better known as the Khandala ghat. This has always been the slow part: steep gradients, curves, lower speed limits and a stretch shared with the old highway, where loaded trucks crawl and queues form. The existing route between the Khopoli exit and Kusgaon is 19 to 20 km long.

The Missing Link is a 13.3 km bypass of that stretch, between the Khopoli exit and Kusgaon near Lonavala, inaugurated on 1 May 2026. Reports put the saving at about 6 km and 20 to 30 minutes. Goods vehicles must stay on the old ghat route, and no separate toll is charged. Tunnels, vehicle rules, directions and closures are covered in our Missing Link guide.

Food malls and fuel stops on the Expressway

The Expressway has two sets of wayside amenities, and each exists on both carriageways, so you never have to cross over. One is at Khalapur, around km 35 from Kalamboli, close to the Khalapur toll plaza below the ghat. The other is at Talegaon (Urse), around km 83.7, close to the Talegaon toll plaza. Each has a food mall, a fuel station and toilets.

From Pune, that puts the Talegaon halt about 11 km after Kiwale and the Khalapur halt about 60 km in, after the ghat. Plan fuel and washroom breaks around that gap of nearly 50 km. Both halts lie outside the stretch the Missing Link bypasses, so you pass them whichever way you cross the ghat. We have not named outlets or fuel brands because they change.

Off the Expressway, Lonavala is the usual meal and chikki stop, reached by the Kusgaon exit on the old alignment. Leaving and rejoining there can change what FASTag deducts, as our toll guide explains. Pulling up on the shoulder for tea, photographs or a phone call is not allowed, and illegal parking is one of the violations the cameras book. Use the food malls.

Pune to Mumbai drive time and when traffic is worst

End to end, the Expressway usually takes one and a half to two hours in normal traffic. Door to door takes longer because of the city roads at each end: central Pune to central Mumbai is about 150 km and commonly 3–3.5 hours. For vehicles allowed on it, the Missing Link has taken 20 to 30 minutes out of the ghat.

The jams follow a pattern. Traffic towards Lonavala and Pune is heaviest on Friday evenings and Saturday mornings, and traffic towards Mumbai on Sunday evenings and on the last day of a long weekend. Queues of several kilometres in the Khandala ghat have been reported at the start of long weekends. Expect heavy traffic at the start of the Diwali, Christmas and summer holidays too.

The monsoon adds fog, heavy rain and landslides in the ghat. On 6 July 2026 a landslide after heavy rain shut the Mumbai-bound side of the Missing Link for more than 18 hours, and traffic was sent by the old ghat route. Leave early, check live traffic before you start and keep a wide margin for a flight. When you ask Yellow Plate Wala for a Pune to Mumbai quote, mention any halt you want, as it changes the route and the timing.

Breakdowns and emergency help

The Expressway control room has a 24-hour helpline: 9822498224. PMRDA’s official list of emergency numbers gives it as the Pune–Mumbai Express Highway Control Room, and the Zero Fatality Corridor road-safety project publishes the same number. For any emergency you can also dial 112, and 108 for an ambulance.

If the car stops, move it to the left shoulder, switch on the hazard lights and place the warning triangle well behind the car. Get everyone out and behind the crash barrier; do not stand between the car and the traffic. Tell the control room your direction and the nearest kilometre stone.

Most trouble here is avoidable. Check tyres, coolant, brakes and fuel before you start, because the ghat is hard on all four. Keep to your lane, use the right lane only to overtake and never reverse towards a missed exit. Cars may not stop on the Expressway to wait for someone, so fix pick-up points off the road.

Common questions

How long is the Mumbai–Pune Expressway and where does it start and end?

It is 94.5 km long. It runs from Kalamboli, near Panvel in Navi Mumbai, to Kiwale, next to Dehu Road on the Pune side. The Missing Link, opened on 1 May 2026, shortens the ghat crossing by about 6 km for the vehicles allowed on it.

What is the speed limit on the Mumbai–Pune Expressway?

For cars it is 100 km/h on the plain sections and 60 km/h in the old ghat section. Buses and goods vehicles are limited to 80 km/h, and 40 km/h in the ghat. On the Missing Link the limit is 100 km/h for cars and 80 km/h for buses. Cameras issue e-challans.

Are bikes allowed on the Mumbai–Pune Expressway?

No. Two-wheelers and three-wheelers are not permitted on the Expressway, and neither are tractors, bullock carts, cyclists or pedestrians. Riders have to use the old Mumbai–Pune highway, NH48, through Lonavala and Khopoli.

Where are the food malls on the Mumbai–Pune Expressway?

There are two halts, each on both carriageways: Khalapur, near the Khalapur toll plaza around km 35 from Kalamboli, and Talegaon (Urse), near the Talegaon toll plaza around km 83.7. Each has a food mall, a fuel station and toilets. From Pune they come about 11 km and 60 km in.

What is the Missing Link on the Mumbai–Pune Expressway?

It is a 13.3 km bypass of the Khandala ghat between the Khopoli exit and Kusgaon, with two tunnels and a cable-stayed bridge. It was inaugurated on 1 May 2026 and saves about 6 km and 20 to 30 minutes. Cars and passenger buses may use it; goods vehicles may not.

How long does Pune to Mumbai take by the Expressway?

The Expressway itself usually takes one and a half to two hours. Central Pune to central Mumbai is about 150 km and commonly 3–3.5 hours, more on Friday evenings, Sunday evenings, long weekends and rainy days.

Sources and official information

Figures and rules on this page were checked against the sources below on 13 November 2026. They change; confirm with the official source before you travel.

Plan your ride with Yellow Plate Wala

Send your pick-up, destination, date, passengers and luggage. The team replies with the car options and the total fare. Compare car categories, read how fares work, or call +91 85302 88290.

Request a quote on WhatsApp

Tell us your route. Get one total fare.

Pick-up, destination, date and how many of you. That is all the team needs to reply.

CallGet a quote